Signing of a contract for construction of a tramway at ul. Powstańców Śląskich in Warsaw

On April 29, 2014, we signed the contract with Tramwaje Warszawskie for the construction of a tramway at ul. Powstańców Śląskich . 

The value of the contract is PLN 78 792 617.84 gross. The contract includes extension and reconstruction of the road system at ul. Powstańców Śląskich (section from ul. Czumy to ul. Pirenejska and the extension of the street at the section ul. Wrocławska – ul. Radiowa), extension and reconstruction of ul. Radiowa (section from ul. Andyjska to ul. Uniejowska ) and the construction and reconstruction of the tram trackbed.

The new route along ul. Powstańców Śląskich (with a length of 2.6 km) will connect the existing routes. It will be built within the lane dividing ul. Powstańców Śląskich , at the section from the hub at the junction of ul. Radiowa and ul. Powstańców Śląskich to the hub at the junction of ul. Górczewska and ul. Powstańców Śląskich .

« Back